Skip to content

Permanent office of Shri Ram Janmabhoomi Trust ready in Ayodhya to be inaugurated on May 22


With the construction of Ram temple in Ayodhya, the work of Shri Ram Trust has also picked up pace. The new permanent office of Shri Ram Janmabhoomi Teerth Kshetra Trust is going to be inaugurated on 22 May. Sages and saints will participate on this occasion. Preparations regarding the program are being finalized.

Please tell that a two-storey office of the trust has been prepared in Ramkot, Ayodhya. Its house warming program has been kept. There will also be a residential block in the permanent Karlalaya of Shri Ram Janmabhoomi Teerth Kshetra Trust. Along with this, trust meetings will be held in the hall.

There will be a discussion on the statue of Ramlala on May 31

A big meeting of Ram Mandir Trust is proposed on 31 May. In this meeting there will be discussion about the statue of Ramlala to be installed in the sanctum sanctorum. The report of the rocks will be discussed for which rock this statue will be made of.

Ramlala’s priests and servants got a big gift in Ayodhya, temple trust doubled their salary

Strategy will be made regarding the arrangement of Ram temple

In the meeting, there will also be a discussion about the arrangement of the Ram temple on the day of Ramlala’s consecration. Let us tell that in January 2024, Ramlala will be seated in the ground floor. Apart from India, holy water has been collected from 7 continents and 155 countries including Ukraine and Russia for the grand consecration of Ramlala.

The statue of Ramlala will be installed in the temple in January 2024

Earlier, Swami Govind Dev Giri Maharaj, Treasurer of Shri Ram Janmabhoomi Teerth Kshetra had told that the construction work of the temple is going on in full swing. ‘In the third week of January 2024, the idol of Ram Lalla (child Lord Ram) will be installed at the original place by the hands of Prime Minister Narendra Modi.’

How ready is Ram Mandir? Janmabhoomi Teerth Kshetra Trust Trust has released pictures and information

He had further told that the work of the temple will continue even after the idol is placed at its original place. We aim to complete the work on the sanctum sanctorum, first floor and make arrangements for darshan before January 2024. The world’s view of India has changed now. He said, ‘Yoga, Ayurveda and Indian music have reached the world and there will be a cultural revolution all over the world.’

Let us tell that more than 50 percent construction work of Shriram temple has been completed. The walls of the sanctum sanctorum have been completed. According to Champat Rai, the first phase of the Ram temple will be completed by October 2023. Pran Pratishtha can happen anytime between January 1 to 14, 2024. He says that the idol of Ramlala will be 51 inches, which will be installed on the platform built in the sanctum sanctorum.

There will be no more waiting to visit the grand Ram temple in Ayodhya, know here when the idol will be installed


—————————————————-

Source link

🔥📰 For more news and articles, click here to see our full list.🌟✨

đź‘Ť 🎉Don’t forget to follow and like our Facebook page for more updates and amazing content: Decorris List on Facebook 🌟💯